New South Village dorm

Companies have been hired for the build:

http://blogs.fayobserver.com/robesonreport/May-2013/Pembroke-based-Metcon-to-build-new-dorm-at-UNC-Cha

Didn’t realize they were building two new dorms in the South Village. Is there a rendering for this one?

Since I’m pretty sure the new dorm across from Hawthorne in now “Phase XII” I’d assume this one is Phase XIII.

http://masterplan.uncc.edu/sites/masterplan.uncc.edu/files/media/MasterPlan/UNCC-2010MasterPlan-FullReport_Revised-2011_04April27.pdf

[quote=“49RFootballNow, post:3, topic:27808”]Since I’m pretty sure the new dorm across from Hawthorne in now “Phase XII” I’d assume this one is Phase XIII.

http://masterplan.uncc.edu/sites/masterplan.uncc.edu/files/media/MasterPlan/UNCC-2010MasterPlan-FullReport_Revised-2011_04April27.pdf[/quote]

That wouldn’t be considered the South Village then. South Village is by the high rises.

[quote=“LoyalNiner, post:4, topic:27808”][quote=“49RFootballNow, post:3, topic:27808”]Since I’m pretty sure the new dorm across from Hawthorne in now “Phase XII” I’d assume this one is Phase XIII.

http://masterplan.uncc.edu/sites/masterplan.uncc.edu/files/media/MasterPlan/UNCC-2010MasterPlan-FullReport_Revised-2011_04April27.pdf[/quote]

That wouldn’t be considered the South Village then. South Village is by the high rises.[/quote]The first article he linked clearly stated that it will be in South Village.

49FBN simply said that the new dorm near Hawthorne is called Phase XII and this is the next dorm slated to be built, so it is safe to assume it will be called Phase XIII. His post had nothing to do with location.

• Residence Hall Phase XIII – design and construction of a 400 bed freshman residence hall in the South Village area to meet increasing enrollment growth. Rooms will be configured in suite style and each floor will include a classroom, laundry room, lounge, multi-purpose rooms and wireless internet access in the common areas – Project Manager – Rick Ellis, 704.687.0517, reellis@uncc.edu – Designer – LS3P Associates Ltd – Construction Manager – Balfour Beatty Construction/Metcon – Commissioning Services – System WorCx – Construction Phase May 2014
http://facilities.uncc.edu/advertisements/upcoming-capital-projects-information-51413-update (doc linked there)